Construction schedule is 1/3 of typical conventional construction method. *1

Manufacturing of prefabricated panels and other modules in the factory account for more than 70% of total construction process, and that contribute to a short construction schedule as low as 45 days completion after foundation work(for houses of less than 148.76 m2).

Floor insulation panels are tightly arranged on the foundation.

 

Prefabricated walls consisting of structural plywood, double insulation and window sashes are installed.

 

Structural floor panels are placed on the second floor.

Prefabricated walls are installed on the second floor panels.

 

Ceiling panels cover whole structure with 235mm thickness insulations.

 

Completion of i-cube, a house with "super-insulation and highly energy-efficient".

*1. Ratio when compared to our company's products